| SS2S DoubleSShot Project -- Work Package Summary Rev.2011-01-15 | |||||||||
| WP # | Task Subject Click on hyperlink to open WP document |
Task breakdown | Task details | Task Owners Goal: 2 Owners per task |
Est. release date for WP document | ||||
| 1 | a | Launch Approval | Location selection | released | |||||
| 1 | b | Regulations | |||||||
| 1 | c | Organize and prepare analyses for flight clearance | |||||||
| 1 | d | Obtain permit | |||||||
| 2 | Nosecone and fins thermal heating analysis | Cliff Bates | released | ||||||
| 3 | a | Propellant | Procurement of chemicals | released | |||||
| 3 | b | Premixing | |||||||
| 3 | c | Melting & casting appartus | |||||||
| 3 | d | Grain moulds | |||||||
| 3 | e | Grain casting (2 static; 1 flight) | |||||||
| 3 | f | Grain storage | |||||||
| 4 | a | Boilerplate motor | Assembly and detail part design | released | |||||
| 4 | b | Nozzle | |||||||
| 4 | c | Midbulkhead | |||||||
| 4 | d | Forward Bulkhead | |||||||
| 4 | e | Casings | |||||||
| 4 | f | Casting tubes | |||||||
| 4 | g | Delay Plug | |||||||
| 4 | h | Pyrogen and igniter system | |||||||
| 5 | a | Static/Flight motor | Assembly and detail part design | Feb.26 | |||||
| 5 | b | i | Nozzle | Shell | |||||
| 5 | b | ii | Ring | ||||||
| 5 | b | iii | Throat insert | ||||||
| 5 | b | iv | Ablative liner | ||||||
| 5 | c | i | Midbulkhead | Shell | |||||
| 5 | c | ii | Delay Plug | ||||||
| 5 | c | iii | Ablative liner | ||||||
| 5 | c | iv | Burst Diaphragm | ||||||
| 5 | d | Forward Bulkhead | |||||||
| 5 | e | i | Casings | Closure attachments | |||||
| 5 | e | ii | Hydrostatic testing | ||||||
| 5 | e | iii | Thermal liner installation | ||||||
| 5 | e | iv | Joints region reinforcement | ||||||
| 5 | f | Casting tubes | Finishing/painting | ||||||
| 5 | g | Pyrogen units | |||||||
| 6 | a | Fins | Design | released | |||||
| 6 | b | Fabrication | |||||||
| 7 | a | Nosecone | Design | released | |||||
| 7 | b | Fabrication | |||||||
| 8 | a | Aft Avionics/Recovery Bays | Design | Feb.12 | |||||
| 8 | b | Fabrication | |||||||
| 9 | a | Airframe couplers | Motor coupler | Feb.26 | |||||
| 9 | b | Nosecone coupler | |||||||
| 9 | c | Taper couplers | |||||||
| 10 | a | Payload & camera support structure | Forward Avionics Bay | Mar.12 | |||||
| 10 | b | Aft Avionics Bay | |||||||
| 11 | a | De-spin System | Design | Xavier Savaris | released | ||||
| 11 | b | Bench testing | Xavier Savaris | ||||||
| 11 | c | Fabrication | Xavier Savaris | ||||||
| 11 | d | In-situ testing | Xavier Savaris | ||||||
| 12 | a | Recovery System | Design | Feb.12 | |||||
| 12 | b | Chute sizing | |||||||
| 12 | c | Fabrication of components | |||||||
| 12 | d | Ground testing | |||||||
| 12 | e | Flight testing | |||||||
| 13 | a | Static Test Ground Support | Thrust/pressure measurement | Jan.22 | |||||
| 13 | b | Thermal measurements | |||||||
| 13 | c | Water dousing system | |||||||
| 13 | d | Test rig to support motor | |||||||
| 14 | a | i | Launch Ground Support | Investigate launch platform options | Choice of tower or rail | Feb.12 | |||
| 14 | a | ii | Investigate existing launchers | ||||||
| 14 | a | iii | Modification of existing launchers | ||||||
| 14 | a | iv | Design & implement mods | Design new/mod launcher | |||||
| 14 | b | Procedure of Assembly of rocket & installation into launcher | Fabricate new launcher/modify existing | ||||||
| 14 | c | Procurement of ground support & safety equipment (rental/borrow/purchase) | |||||||
| 14 | d | Launch Angle & Touchdown prediction | |||||||
| 14 | e | Motor igniter shunt ejection device | |||||||
| 15 | a | Proof loading | Fins (mounted) | Mar.12 | |||||
| 15 | b | Nosecone | |||||||
| 15 | c | Complete vehicle | |||||||
| 16 | Flight Avionics | See separate document for task descriptions and task owners. | |||||||
| For information about volunteering contact: | Richard Nakka | ||||||||