Highlights of recent developments on the MiniSShot Project
-------------------------------------------------------------
- Peter Kocalka has fabricated a prototype patch antenna for the
telemetry system. The prototype is currently too large to fit our
rocket, however, Peter is endeavouring to reduce it to a practical size.
http://sugarshot.org/downloads/patchantena4.gif
Peter also reports that the telemetry/main computer system is ready for
use, and that he has successfully tested communication over a distance
of 20km on the ground.
- A tentative arrangement of the various payload items in the MiniSShot
vehicle has been arrived upon. The real estate is tight, but everything
should fit.
http://sugarshot.org/downloads/ms_vehicle_config_2009-10-01.pdf
- Richard has completed initial refurbishment of the motor casings.
Next, both casings will be hydro-statically proof pressure tested, a key
requirement to demonstrate structural integrity.
- Andre reports that he has successfully "reverse engineered" the
Motorola GMRS radio ear-plug which will allow for direct interfacing of
the DTMF tone generator circuit to the radio. Andre had also completed
the vibrations sensor logger firmware, and has written a draft version
of a manual for it.
---
Note: the Weekly Activity Report will not be published next week due to
the upcoming holiday. The next report will appear on October 19th.
--------------------
Help keep SS2S alive and thriving by making a financial donation. We
need your support. http://www.sugarshot.org/sponsors.html#Donors
_______________________________________________
SS-Main mailing list
SS-Main@sugarshot.org
http://www.exrocketry.net/mailman/listinfo/ss-main
|